Environmental Impact Assessment (EIA)

  • 2017-ongoing. EIA for superficies permit of Paldiski pump-hydro accumulation station. Energiasalv Pakri OÜ
  • 2017-ongoing. EIA for construction project of border marking (dangerous area border marking) of area used for permanent state defence training in state forest surrounding the central training ground of the Defence Forces, walk paths and viewing tower of the State Forest Management Centre. Ministry of Defence
  • 2016-ongoing. EIA of the project for design of Nursipalu training ground roads and training facilities. Ministry of Defence
  • 2016-ongoing. EIA of construction of ammonium terminal in Sillamäe harbour. EuroChem Terminal Sillamäe AS
  • 2015-ongoing. EIA for construction of (additional gas pipelines for) Nord Stream 2. Ramboll Finland / Nord Stream 2 AG
  • 2015-2017. EIA for Kohtla-Järve limestone open mine. VKG Tsement OÜ
  • 2013-ongoing. EIA of the offshore wind park planned to the sea of Northwest Estonia. Nelja Energia AS
  • 2013-2015. EIA of Balticconnector project (gas pipeline between Estonia and Finland). Ramboll Finland Oy
  • 2013-2014. EIA of the development plan of air traffic area of Tallinn Airport. AS Tallinna Lennujaam
  • 2013. EIA of reconstruction of Sindi hydrosystem. RAJU AS
  • 2011. EIA for Karude IV sand quarry of Karude gravel deposit. Nordecon AS
  • 2011. EIA of preliminary design for reconstruction of Tallinn roundabout (km 37,8 - 38,4) and Tallinn-Paldiski road (km 24,7 - 27,2). Road Administration
  • 2011. EIA of AS TankChem application for air contamination permit. TankChem AS
  • 2011. EIA of technical design for reconstruction of Aegna harbour. Tallinn Public Utilities Administration
  • 2011. EIA for overtaking area of Keila. Road Administration
  • 2010. EIA for reuse of Jägala-Joa hydro power station. Jägala Energy OÜ
  • 2010. EIA of Väo waste burning station. Ben Energy OÜ
  • 2009. EIA of preliminary design for Tartu eastern roundabout. City of Tartu, Rural Municipality of Tartu
  • 2009. EIA of Nord Stream (Baltic Sea gas pipeline) project. Ramboll Oil & Gas
  • 2009. EIA of preliminary design for Rõmeda-Haljala section (km 78,4-90,5) of E20 Tallinn-Narva road. Road Administration
  • 2009. EIA of preliminary design of Kose-Võõbu (km 40,0-68,0) and Võõbu-Mäo (km 68,0-85,0) sections of road E263 Tallinn-Tartu-Võru-Luhamaa. Road Administration
  • 2009. EIA technical assistance for deepening and reconstruction of ship routes in West-Estonian archipelago. Estonian Maritime Administration
  • 2008. EIA of preliminary design for Tagadi-Rapla section (km 23,9-47,5) of road T-15 Tallinn-Rapla-Türi. Reaalprojekt OÜ
  • 2008. EIA of preliminary design for Rõmeda-Haljala section (km 78,4-90,5) of T1 Tallinn-Narva road. Viru Roads Administration
  • 2008. EIA of preliminary design for Rakvere-Sõmeru section of road T-5 Pärnu-Rakvere-Sõmeru. AS Teede Tehnokeskus
  • 2008. EIA of the project "Technical assistance in order to decrease environmental pollution in Ahtme thermal power station". Kohtla-Järve Soojus AS

Strategic Environmental Impact Assessment (SEA)

  • 2017-ongoing. SEA of detailed plan of Paldiski pump-hydro accumulation station. Energiasalv Pakri OÜ
  • 2017-ongoing. SEA of comprehensive plan of Raasiku Rural Municipality. Raasiku Rural Municipality
  • 2017-ongoing. SEA for state special plan of central training ground of the Defence Forces. Ministry of Defence
  • 2017-ongoing. SEA of detailed plan of Tartumaa Health Sports Centre. SA Tehvandi Spordikeskus
  • 2017-ongoing. SEA of detailed plan of Kernu estate. Kernu Rural Municipality
  • 2016-ongoing. SEA of comprehensive plan of Muhu Rural Municipality. Muhu Rural Municipality
  • 2015-ongoing. SEA of detailed plan of Ranna tee 1 land plot and its surroundings. Vironia Keskus
  • 2015-ongoing. SEA of comprehensive plan of Kuusalu Rural Municipality. Kuusalu Rural Municipality
  • 2012-ongoing. SEA for detailed plan of Lonessa perspective petroleum products terminal. Viimsi Rural Municipality
  • 2011-ongoing. SEA of detailed plan of Muuga pump-hydro accumulation station. Energiasalv OÜ, Jõelähtme Rural Municipality
  • 2015-2017. SEA of comprehensive plan of the city of Tartu. Tartu Municipality
  • 2016-2017. SEA for detailed plan of Suure-Jaani industrial area. Suure-Jaani Rural Municipality
  • 2015-2017. SEA for detailed plan of Jõekalda. Alajõe Rural Municipality
  • 2016. Consultation on the plan to elaborate SEA for comprehensive plan of the town of Valga. Valga Municipality
  • 2015-2016. SEA for detailed plan of access road to Karoli meadow and the bridge necessary for crossing the channel. State Forest Management Centre
  • 2015-2016. SEA of Saare county plan. Saare County Government
  • 2014-2016. SEA of Hiiu county plan. Hiiu County Government
  • 2013-2016. SEA of Põlva county plan. Põlva County Government
  • 2013-2016. SEA of Valga county plan. Valga County Government
  • 2013-2016. SEA of Võru county plan. Võru County Government
  • 2013-2016. SEA of Jõgeva county plan. Jõgeva County Government
  • 2013-2016. SEA of Järva county plan. Järva County Government
  • 2013-2016. SEA of comprehensive plan of Sauga Rural Municipality. Sauga Rural Municipality
  • 2014-2015. SEA of thematic plan "Kilingi-Nõmme – Riia TEC-2 330 kV overhead line route corridor positioning" of Pärnu and Viljandi county plans. Pärnu County Government, Viljandi County Government
  • 2014. SEA for detailed plan of Võrusoo industrial area. Võru County Government
  • 2013. SEA for detailed plan of Vahtra big farm extension. Weiss OÜ
  • 2012. SEA of thematic plan and preliminary design of km 0,0-7,2 Tartu-Rõhu section of main road No. 92 Tartu-Viljandi-Kilingi-Nõmme. Road Administration
  • 2012. SEA for thematic plan of identifying land area for Sirgala wind farm. Toila Rural Municipality
  • 2012. SEA programme for thematic plan of Tootsi Suursoo area and wind park. Vändra Rural Minucipality
  • 2011. Expert assistance for compilation of prospective management plan of passenger and cargo transport across the Great Strait and SEA. Road Administration
  • 2011. SEA for Lagedi tee and Peterburi tee area detailed plans and Natura evaluation of Pirita river. Tallinn Environment Agency, Tallinn Urban Planning Administration
  • 2011. SEA for comprehensive plan of Lasnamäe industrial areas. Tallinn Environment Agency
  • 2011. SEA for detailed plan of Klooga training ground. Ministry of Defence
  • 2010. SEA for comprehensive plan of Narva Old Town district, Narva Municipality
  • 2010. SEA for detailed plan of Tagamaa land plot (emergency reserve power station). Elering OÜ
  • 2010. SEA for thematic plan connecting Pärnu city and surrounding networks. Pärnumaa Municipalities Union
  • 2010. SEA for detailed plan of Mikle and Välja land units. Tiina Aljas
  • 2010. SEA for thematic plan "Choice of location for Aidu wind park with significant spatial impact, its supporting infrastructure, recreation areas and shooting range". Maidla Rural Municipality, Rasireks Elekter OÜ, Kindel Vara OÜ, Eesti Energia Kaevandused AS, VKG Kaevandused OÜ
  • 2009. SEA for detailed plan of Lao str. 17 land plots. Maardu Katlamaja AS
  • 2008. SEA for detailed plan of Paldiski Lõunasadam (Paldiski South Harbour). AS Tallinna Sadam
  • 2008. Sea for thematic plan of Tallinn streets network and light traffic roads. Tallinn Environment Agency

Preliminary environmental impact assessment

  • 2017-ongoing. Preliminary assessment of main project of km 209,195-216,918 section of main road 7 Missokülä-Hindsa. Road Administration
  • 2017. Preliminary assessment of main project of Lasva bicycle and pedestrian road on km 3,42-3,98 section of secondary road 25239 Pindi-Verijärve. Road Administration
  • 2017. Preliminary assessment of main project for enhancing safety of Kanariku junction and construction of pedestrian road on km 5,6-5,98 section of basic road 61 Põlva – Reola. Road Administration
  • 2017. Preliminary assessment of detailed plan of Ihba land unit. A-Profiil OÜ
  • 2017. Preliminary strategic assessment of detailed plan of gravel mine in Nissi Rural Municipality. Nissi Rural Municipality
  • 2017. Preliminary assessment of detailed plan of Jaani-Andruse land plot. Muhu Rural Municipality
  • 2016-2017. Preliminary assessment of detailed plan of Pilliroo land plot. JND Transport & Logistics OÜ
  • 2016. Preliminary assessment of construction of Peat Mill OÜ wind turbines. Peat Mill OÜ
  • 2016. Preliminary assessment of project for Lüllemäe bicycle and pedestrian road on km 15,15-16,27 of secondary road 23201 Puurina-Lüllemäe-Litsmetsa. Road Administration
  • 2016. Preliminary assessment of detailed plan of Vilja land plot. Sauga Rural Municipality
  • 2016. Preliminary assessment of detailed plan of Sepasalu land plot
  • 2016. Preliminary assessment of light traffic roads in Illuka Rural Municipality. Illuka Rural Municipality
  • 2016. Preliminary assessment of detailed plan of Mihkli and Väike-Mihkli land plots. Plaan OÜ
  • 2016. Preliminary assessment of extension of Oisu biogas station. Oisu Biogaas OÜ
  • 2016. Preliminary assessment of detailed plan of Kernu estate and airport. Kernu Rural Municipality
  • 2016. Preliminary assessment of detailed plan of Maardu tee 23. KA Osaühing
  • 2015. Preliminary assessment of detailed plan of Sambla. Luunja Rural Municipality
  • 2015. Preliminary assessment of detailed plan of Vähila land plot. Tuisu OÜ
  • 2015. Preliminary assessment of detailed plan of Baltic Sea artificial harbour. SA Uue Kunsti Muuseum
  • 2015. Preliminary assessment of detailed plan of Padila land unit. Luunja Rural Municipality
  • 2015. Preliminary assessment of detailed plan of Talli land unit. Luunja Rural Municipality
  • 2015. Linnamäe 42 environment examination. Hauers KVK OÜ
  • 2015. Preliminary assessment of Warmeston OÜ CHP. Warmeston OÜ
  • 2015. Preliminary assessment of reconstruction project for Jõhvi-Puru km 3,57-8,25 section of main road No. (E264) Jõhvi-Tartu-Valga. Road Administration
  • 2015. Preliminary assessment of thematic plan on km 82,852-93,914 Kenganurme-Tihemetsa section of road T6 Valga-Uulu. Road Administration
  • 2015. Preliminary assessment of construction of Vägari thermal and electric joint power station. OÜ Baltania
  • 2014. Preliminary assessment of reconstruction project for km 25,5-33,6 section of basic road No. 62 Kanepi-Leevaku. Road Administration
  • 2012. Preliminary assessment of mobile metal press and equipment for cleaning of cables. BLRT Refonda OÜ
  • 2011. Preliminary assessment of detailed plan of Metsa land unit in Võiküla village in Muhu Rural Municipality. Estwind Energy OÜ
  • 2011. Preliminary assessment of detailed plan of Lii-Sii and Laasi land plots in Urge village in Kohila Rural Municipality in Raplamaa (planning of waste disposal centre). Ragn-Sells AS

Noise Studies And Noise Modelling

  • 2017. Noise study for detailed plan of Raudtee str. 64a. K-Projekt AS
  • 2017. Noise study for detailed plan of Loode str. 2. Private person
  • 2017. Pille str. 24 noise study. CarOne Motors OÜ
  • 2017. Noise study for detailed plan of Juhkentali 28. Hausers Grupp OÜ
  • 2017. Noise study for Ainja II sand quarry. Kobras AS
  • 2017. Noise study for detailed plan of Uue-Matsi and Kiivi. Fonde Holding OÜ
  • 2016-2017. Noise study for Sillamäe ammonium terminal. Eurochem Terminal Sillamäe AS
  • 2016-2017. Technical design of Kernu detour on km 37-42 of basic road No. 4 (E67) Tallinn-Pärnu-Ikla. Noise study. Road Administration
  • 2016. Noise measuring and noise study of Salutaguse yeast plant. Salutaguse Pärmitehas AS
  • 2016. Noise study for detailed plan of Mõtuse str. 29. K-Projekt AS
  • 2016. Noise study for detailed plan of Kopli 16. Paasik OÜ
  • 2016. Noise measuring for Auvere power stations. Alstom Power Sp. Z.o.o.
  • 2016. Noise study of Paljassaare tee 2 detailed plan. K-Projekt AS
  • 2016. Noise study of Soodla training ground. Ministry of Defence
  • 2016. Noise study for detailed plan of Koruserva. K-Projekt AS
  • 2016-2017. Measuring and modelling of noise in Purila granule plant. Warmeston OÜ
  • 2015. Noise study for draft design of II construction area of Tartu detour. Road Administration
  • 2015. Expert opinion on noise in Pilliroo str. residential area. Danel Tuusis
  • 2015-2016. Noise study for Kamali II and Kamali III sand quarry. Maves AS
  • 2015. Noise study for detailed plan of Luise str. 24. OÜ SMG Invest
  • 2015. Noise study for detailed plan of Varraku str. 12, Tähesaju road land plots. Maves AS
  • 2015. Noise study for detailed plan of A. Lauteri 3 land plot. Maves AS
  • 2015. Noise study for detailed plan of Tööstuse 16. Poopuu & Kaasik
  • 2015. Juuliku junction noise modelling and measures for minimisation of environmental impact. Road Administration
  • 2015. Ehitajate str. (Järveküla-Piiri str.) in Kohtla-Järve. Technical design (assessment of noise level). Kohtla-Järve Municipality
  • 2015. Preliminary study and draft solution for km 122,8-125 Jänesselja round-Pärnu boundary section of road 4 TII-Prn-Ikla (assessment of noise from traffic and in residential areas). Road Administration
  • 2015. Noise calculations on km 40,0-42,0 section of Kose-Ardu km 40,0-52,7 section of road E263 Tallinn-Tartu-Võru-Luhamaa. Road Administration
  • 2015. Identifying of position for Riisipere-Haapsalu-Rohuküla railway route corridor. Noise study and expert opinion on vibration of railway route. Lääne County Government
  • 2015. Noise study for Juhkentali 28b. Hausers KVK OÜ
  • 2014. Traffic noise study in Messilä district in Finland. Ramboll Finland OY
  • 2014. Põrguvälja junction and Jüri distribution round (modelling of noise level). Road Administration
  • 2014. Development project for air traffic area of Tallinn Airport (assessment of noise impact). Tallinna Lennujaam AS
  • 2013-2017. Noise modelling for offshore wind park planned in North-West of Estonia. Nelja Energia AS
  • 2013. Noise modelling for Paikuse wind turbines. Elektri Energia AS
  • 2013. Designing and construction of E263 Aruvalla-Kose road section (noise studies). Road Administration
  • 2013. Additional noise study works for wind park of SEA for thematic plan of Aidu quarry. Roheline Elekter AS
  • 2013. Noise study for preliminary project of Kadaka pst 117/Tammepärja. PO 2 OÜ
  • 2013. Noise modelling for wind park to be created in Vaivara Rural Municipality in Mustanina village. Roheline Elekter AS
  • 2013. Noise-related consultations. Ramböll Sverige AB
  • 2012. Preliminary assessment of mobile metal press and equipment for cleaning of cables (noise modelling). BLRT Refonda OÜ
  • 2012. Thematic plan, preliminary design and SEA of km 0,0-7,2 Tartu-Rõhu section of main road No. 92 Tartu-Viljandi-Kilingi-Nõmme (noise modelling). Road Administration
  • 2012. Noise modelling for Krüüdneri V quarry. Kobras AS
  • 2012. SEA for detailed plan of Vahtra big farm extension (assessment of noise impacts, noise modelling). Weiss OÜ
  • 2012. Noise study for detailed plan of Tatari str. 51a, Tatari str. 53, Vana-Lõuna str. 4, Vineeri str. 2, Vineeri str. 4, Vineeri str. 6, Vineeri str. 8, Pärnu road 69, Pärnu road 69a and Pärnu road 69b land plots. K Projekt
  • 2012. Identifying of position for Harku-Lihula-Sindi 330/110 kV overhead power line (modelling of traffic noise). Harju County Government, Lääne County Government, Pärnu County Government
  • 2012. Measuring and assessment of military noise in Estonia. Ministry of Defence
  • 2012. Noise study for km 4,2-5,3 section of national road 11390 Tallinn-Rannamõisa-Kloogaranna. Road Administration
  • 2012. Noise study for detailed plan of Lilleoru. SR Veod OÜ
  • 2012. Measuring and assessment of military noise in NATO and EU countries. Ministry of Defence
  • 2011. Noise study of Nursipalu training ground. Ministry of Defence
  • 2011. Noise study for Nafta str. 1, Petrooleumi str. 6 land plot, Petrooleumi str. 8 land plot, Bensiini str. 9 land plot, Bensiini str. 9a land plot and for detailed plan. K Projekt AS
  • 2011. Noise study for detailed plan of Rõõmu str. 2 and 4 and Vabaduse boulevard 175 land plots. K-Projekt AS
  • 2011. Noise study of detailed plan of Mere boulevard 104 and its neighbouring area. K-Projekt AS
  • 2011. Modelling of traffic noise for SEA of detailed plan for Kakumäe road 120. Adepte Ekspert OÜ
  • 2011. Noise study for detailed plan of Kakumäe road 107 in Tallinn. Adepte Ekspert OÜ
  • 2011. Noise study for detailed plan of Õismäe road 105, 105a, 107 and 107a land plots and surrounding area. K-Projekt AS
  • 2011. EIA of preliminary design for reconstruction of Tallinn roundabout (km 37,8 - 38,4) and Tallinn-Paldiski road (km 24,7 - 27,2) (noise modelling). Road Administration
  • 2011. EIA of Karude IV sand quarry of gravel quarry (noise modelling, elaboration of minimising measures). Nordecon AS
  • 2011. Preliminary assessment of detailed plan of Metsa land unit in Võiküla village in Muhu Rural Municipality (noise modelling). Estwind Energy OÜ
  • 2011. Compilation of detailed plan for Klooga training ground and SEA (assessment of noise impact). Ministry of Defence
  • 2011. Noise analysis of Pirkkala roads. Ramboll Finland OY
  • 2011. Modelling of traffic noise in Halland, Sweden. Ramböll Sverige AB
  • 2011. Planning and consulting with respect to wind energy of Pärnumaa, Ruhnu and the Gulf of Riga (modelling of wind park noise). Eesti Energia AS enterprise for renewable energy
  • 2011. SEA for Sirgala wind park (assessment of noise impact). Toila Rural Municipality
  • 2011. SEA for thematic plan "Choice of location for Aidu wind park with significant spatial impact, its supporting infrastructure, recreation areas and shooting range" (assessment of noise impact). Maidla Rural Municipality
  • 2010. SEA for comprehensive plan of Narva Old Town district (assessment of noise impacts). Narva Municipality
  • 2010. Noise study of Kikepera training ground. Ministry of Defence
  • 2010. Noise study of Paljassaare põik 16 detailed plan. Adepte Ekspert OÜ
  • 2010. Noise study for planned ventilation shaft. Eesti Energia Kaevandused AS
  • 2010. Ecobay noise study. Adepre Ekspert OÜ
  • 2010. Noise study for detailed plan of Mines harbour and surrounding area. Ministry of Defence
  • 2010. Noise study for detailed plan of Astangu 7 land plot. Adepre Ekspert OÜ
  • 2010. Modelling of traffic noise in Järvastadeni region. In Sweden, Ramböll Sverige AB
  • 2007. Tallinna linna välisõhu strateegiline mürakaart. Tallinna Keskkonnaamet
  • 2010. Noise analysis of T5 Kirna road section. Nordecon Infra AS
  • 2010. Noise modelling for Iru power station. Eesti Energia AS
  • 2010. SEA for detailed plan of Tagamaa (assessment of industrial noise). Elering OÜ
  • 2010. Detailed plan of Jüri-Jaani land plot and surrounding area (noise modelling). Eesti Energia AS enterprise for renewable energy
  • 2010. SEA for comprehensive plan of Lasnamäe industrial areas (noise assessment). Tallinn Environment Agency
  • 2010. Noise study of the area of detailed plans at Tähetorni 90, 90B, 96; Tähetorni 98; Paldiski road 243B and Paldiski road 241, 241D, 243A. Adepte Ekspert OÜ
  • 2009. Noise study of detailed plan of Paldiski road 50 land plot and surrounding area. Adepte Ekspert OÜ
  • 2009. Noise study of detailed plan of Suur-Sõjamäe str. 42 land plot. Tallinn Urban Planning Administration
  • 2009. EIA of preliminary design for Rõmeda-Haljala section (km 78,4-90,5) of E20 Tallinn-Narva road (noise modelling). Road Administration
  • 2009. EIA of preliminary design of Kose-Võõbu (km 40,0-68,0) and Võõbu-Mäo (km 68,0-85,0) sections of road E263 Tallinn-Tartu-Võru-Luhamaa (noise modelling). Road Administration
  • 2009. EIA of preliminary design for Tagadi-Rapla section of road T-15 Tallinn-Rapla-Türi (noise modelling). Reaalprojekt OÜ
  • 2008. Traffic noise analysis for detailed plan of Koguduse and Saula. OÜ Kirikuvara Haldus
  • 2008. SEA for detailed plan of Maardu Lao str. 17/1, 17/2 and 17/3 land plots (noise modelling). AS Maardu Katlamaja
  • 2008. SEA for detailed plan of Paldiski Lõunasadam (Paldiski South Harbour) (noise modelling). Tallinna Sadam
  • 2007. Strategic noise map for the ambient air of Tallinn. Tallinn Environment Agency

Expert Opinions And Consultations

  • 2017-ongoing. Environmental consultations for Vägari torrefaction plant. Baltania OÜ
  • 2017-ongoing. Inventory of flora of Lilian land plot. Sarto Holding OÜ
  • 2017. Environmental Research of Minimising Measures at the Time of Construction Arising from Environmental Impact Assessment of Offshore Gas Pipeline. Elering AS
  • 2017. Compilation of the summary for the survey on the supply reliability of natural building materials for Rail Baltic. Ministry of Economics and Communication
  • 2016-2017. Technical market analysis of wind energy. Nordex Energy GmbH

 

  • 2014-ongoing. Rendering of consultation services on environmental management, Elering AS. Elering AS
  • 2016. Expert opinion on the functioning of green network of Tuuleveski land plot of Jälgimäe village in Saku Rural Municipality. Optimal Projekt OÜ
  • 2016. Compilation of tender documentation for the survey on the supply reliability of natural building materials for Rail Baltic. Technical Surveillance Authority
  • 2014-2016. Identifying of potential consumers of public water supply and sewerage system remaining outside the service area of water enterprise in the areas of collecting wastewater, and planning of measures for implementation of drinking water and wastewater treatment according to the requirements. Estonian Water Works Association
  • 2015. Examination of Balticconnector EIA report. EG Võrguteenus AS
  • 2015. Survey for ensuring of functioning of green network in the area of Golfi road in Veskitaguse village of Rae Rural Municipality. Rae Rural Municipality
  • 2015. Consultation on construction of wind turbines on Vallimaa and/or Sarapuu land unit. Tardek OÜ
  • 2015. Environmental and Social Audit and Assessment Report. Livonia Partners
  • 2014. Compilation of expert opinion on SEA for thematic plan of Hiiumaa offshore area. Nelja Energia OÜ
  • 2014. Consultation on environmental studies and impact assessment of Balticconnector natural gas pipeline development project. Ramboll Finland/Gasum Oy
  • 2013. Expert opinion on SEA report for detailed plan of the area of joint warehouse of energy complex. Eesti Energia Kaevandused AS
  • 2013. Planning and consulting with respect to wind energy of Pärnumaa, Ruhnu and the Gulf of Riga. Eesti Energia enterprise for renewable energy
  • 2013. Study of Natura assessment in Estonia and other EU countries and compilation of guiding materials for performance of Natura assessment on the basis thereof. Environment Agency, project partner Ministry of Environment, works performed by SA Keskkonnainvesteeringute Keskus (Centre of Environmental Investments Fund)
  • 2011. Maritime-related market study and consultations in the Baltic States. SECORA AS
  • 2010. Market study of environmental analyses. Ramboll Analytics Oy
  • 2010. Technical comparison of LNG terminal locations in Paldiski, Muuga and Inkoo harbours. Balti Gaas OÜ
  • 2010. Eesti Energia laboratories effectiveness audit. Eesti Energia AS
  • 2010. Reconstruction of Lahe bridge together with designing. Road Administration Southern Region
  • 2008. Examination of EIA for Juuliku-Tabasalu road project. Road Administration
  • 2008. Examination of EIA for Tallinn roundabout and Paldiski road reconstruction project. Road Administration
  • 2007. Examination of SEA for detailed plan of Kakumäe yacht harbour and surrounding area. Laesson Partnerid OÜ

Environmental Surveys

  • 2017-ongoing. Pilot project for decreasing the level of dust at the ash dump of Balti Elektrijaam (Baltic Power Station). Enefit Energiatootmine AS
  • 2017-ongoing. Monitoring of swamp condition and flora in Puhatu protected area. Enefit Energiatootmine AS
  • 2017-ongoing. Environmental supervision of Paldiski fish flour plant. BauEst OÜ
  • 2016. Geological and geotechnical survey of Tootsi Suursoo wind park area. Eesti Energia AS
  • 2016. Survey for solution of dust problem at ash dump No. 1 of Balti Elektrijaam. Eesti Energia Narva Elektrijaamad AS
  • 2017. Contamination study at Pille str. 24. CarOne Motors OÜ
  • 2016. Assessment of environmental condition of Suur-Sõjamäe 29a and contamination study. RTG Arhitektid OÜ
  • 2016. Contamination study of the area between Kaare street and Linnamäe road and Jõe str. 57b land plot. AS Hoolekandeteenused
  • 2014-2016. Monitoring of birds and bats of Paldiski wind park. Paldiski Tuulepark OÜ
  • 2014-2016. Hiiumaa wind park studies. Nelja Energia OÜ
  • 2015. Identification of water protection measures for the area between the Lake of Maardu and Maardu junction. Road Administration
  • 2015. Biogas measuring at Tallinn wastewater treatment plant. ICP Solutions OÜ
  • 2015. The study of consumption of thin plastic bags and analysis of the impact of reduction in consumption. Ministry of the Environment
  • 2015-2015. Monitoring of bats of Aseriaru wind park. Aseriaru Tuulepark OÜ
  • 2015. Cost calculation of the transportation of oil shale ash (OSA) to Kokkola. Ramboll Finland OY
  • 2014. Study of thermal power stations in Estonia. Ramboll Denmark
  • 2014. Air quality measurement study, odour survey. Eesti Energia Õlitööstuse AS
  • 2014. Study of the impact of Uus-Kiviõli mine on fauna and the inventory of Natura 2000 areas. Eesti Energia Kaevandused AS
  • 2012. Consultations on oil shale ashes. Eesti Energia Narva Elektrijaamad AS
  • 2012. Feasibility study for construction of additional gas pipelines for Nord Stream. Ramboll Oil & Gas / Nord Stream AG
  • 2012. Environmental examination of the intended 300 MW CFB power station area. Alstom Estonia AS
  • 2010. Selection of location for Aruküla emergency reserve power station. Elering OÜ
  • 2008. Technical aid for minimisation of environmental pollution in Ahtme SEJ. Kohtla-Järve Soojus AS
  • 2007. Monitoring of live nature on Maardu-Valgejõe section of T1 Tallinn-Narva road. Road Administration

Preparation Of Applications For Permits

  • 2017-ongoing. Compilation of applications for permits necessary for construction of Balticconnector. Elering AS
  • 2016. Compilation of application for waste permit of Autodoonor OÜ
  • 2016. Compilation of application for hazardous waste licence of Autodoonor OÜ. Autodoonor OÜ
  • 2016. Preparation of baseline report for Pärnu power and thermal joint station. Fortum Eesti AS
  • 2016. Preparation of baseline report for Pärnu boiler house. Fortum Eesti AS
  • 2016. Compilation of ambient air pollution permit and project for emissions limit values for AS AKO. AS AKO
  • 2015. Preparation of baseline report for VKG Soojus AS Ahtme TRK and VKG Energia OÜ Põhja SEJ production areas. VKG Soojus AS and VKG Energia OÜ
  • 2015. Compilation of application for permit for special use of water for Warmeston OÜ. OÜ Warmeston
  • 2015. Compilation of application for permit for special use of water for AS Tallinna Lennujaam. AS Tallinna Lennujaam